Print Back
Reconditioning the used Cleaver Brooks Boiler(s) includes but not limited to the following: boilers re-tubed as required, cleaned on the fireside, waterside, outside, and painting, new fireside and waterside gaskets are installed, hydrostatic tests are done on the vessel. Additionally tubes, boiler trim piping, and blow down piping and valves and new Honeywell or Fireye controls are installed along with new electrical and control panels are installed as needed. New steam pressure controls aremore
Unit of Measure

Specifications

Year

1993

Horsepower

125 hp

Manufacturer

Cleaver Brooks

Pressure

200 psi

Steam or Hot Water

Steam

Burner

Cleaver Brooks

Fuel(s)

natural gas