Reconditioning the used Watertube Boiler(s) includes but not limited to the following: boilers re-tubed as required, cleaned on the fireside, waterside, outside, and painting, new fireside and waterside gaskets are installed, hydrostatic tests are done on the vessel. Additionally tubes, boiler trim piping, and blow down piping and valves and new Honeywell or Fireye controls are installed along with new electrical and control panels are installed as needed. New steam pressure controls are installed, the boilers are re-wired as needed, new safety relief valves are installed or shipped loose for field installation, electrical and mechanical checks are performed to identify defective components, defective components found are replaced. We guarantee that the pressure vessel and tubes are in good condition and that the boiler will pass a hydrostatic test at the time of startup. A one (1) year parts replacement warranty on controls is included.

Used, reconditioned Watertube Boilers, Watertube 3 & 4 pass dry back boilers, Watertube 3 & 4 pass wet back boilers, high pressure boilers, low pressure boilers, hot water boilers, Watertube boiler feed water systems, atmospheric tanks, pressurized deaerators, blow down tanks, blow down separators, flash steam economizers, stack economizers, boiler flame safeguard controls, boiler combustion controls, boiler water level controls.
Unit of Measure
Items
watertube-boilers

30000 PPH Watertube Boiler

watertube-boilers

50000 PPH Watertube Boiler

watertube-boilers

75000 PPH Watertube Boiler

watertube-boilers

75000 PPH Watertube Boiler
Number N/A
Year N/A 1995 N/A 1994 N/A 2014 N/A 2014
PPH Steam/Hr N/A 30000 N/A 50000 N/A 75000 N/A 75000
Horsepower N/A
Manufacturer N/A Nebraska Boiler D-Type N/A Babcock-Wilcox D-Type N/A Babcock-Wilcox D-Type N/A Babcock-Wilcox D-Type
Pressure N/A 250 psi
Steam or Hot Water N/A Steam
Burner N/A Coen N/A John Zink N/A Faber 30 PPM NOx N/A Faber 30 PPM NOx
Fuel(s) N/A natural gas/oil N/A natural gas N/A natural gas N/A natural gas