Reconditioning the Johnston Boiler(s) includes but not limited to the following: boilers re-tubed as required, cleaned on the fireside, waterside, outside, and painting, new fireside and waterside gaskets are installed, hydrostatic tests are done on the vessel, tubes, boiler trim piping, and blowdown piping and valves, new Honeywell or Fireye controls are installed, new electrical and control panels are installed as needed, new steam pressure controls are installed, the boilers are re-wired asmore
1 - 6 of 6 | Results Per Page | View | Unit of Measure
1 

Item #

Year

Horsepower

Manufacturer

Pressure

Steam or Hot Water

Burner

Fuel(s)

N/A 1998 N/A 200 hp N/A Johnston N/A 250 psi N/A Steam N/A Johnston N/A natural gas/oil
N/A 1996 N/A 250 hp N/A Johnston N/A 150 HW psi N/A Hot Water N/A Johnston N/A natural gas
N/A 1996 N/A 250 hp N/A Johnston N/A 15 psi N/A Steam N/A Johnston N/A natural gas
N/A 1996 N/A 500 hp N/A Johnston N/A 150 psi N/A Steam N/A Johnston 30 PPM NOx N/A natural gas
N/A 2007 N/A 600 hp N/A Johnston N/A 150 psi N/A Steam N/A Limpsfield 30 PPM NOx N/A natural gas
N/A 2008 N/A 1000 hp N/A Johnston N/A 150 psi N/A Steam N/A Johnston N/A natural gas/oil
1 - 6 of 6 | Results Per Page | View | Unit of Measure
1